Showing posts with label rail. Show all posts
What we’re doing to prevent landslides near rail lines
Posted by Unknown in Amtrak Cascades, gravity, landslide, mudslide, passenger train, rail, rain on Friday, January 2, 2015
By Barbara LaBoe
You can’t fight Mother Nature. But when it comes to landslides that block rail lines north of Seattle, we’re trying to call a truce.
![]() |
| This 1997 Department of Ecology picture of a landslide near Woodway, WA shows how devastating slides can be to property and rail lines. |
BNSF Railway Company owns and operates the railway. For each landslide on the north rail line, BNSF sets a minimum 48-hour moratorium on passenger rail service between Seattle and Everett. During that time, BNSF clears debris, repairs the tracks and checks the slope. While moratoriums are in effect, buses transport our Amtrak Cascades passengers between the Seattle and Everett stations to continue their train journeys.
We manage the Amtrak Cascades passenger rail service along with the Oregon Department of Transportation. Amtrak operates the service for the two states. So we take train safety and landslide disruptions seriously.
![]() |
| Retaining walls, like this one, help catch and contain landslide debris before it can reach the tracks. |
We also, along with other work group members, held three educational open houses in communities along the north rail line to allow landowners to learn about landslide risks and prevention on their property. We met with mayors and city councils this year in Mukilteo, Edmonds and Everett about the issue. And a brochure with information and prevention tips (pdf 340 kb) was mailed to landowners along the affected rail corridor. In some cases, preventive measures are simple, such as planting native vegetation to prevent erosion and reduce the risk of landslides. New or reworked drainage systems also can help stabilize the slope and safeguard property -- as well as the rail lines. As part of this process, BNSF also agreed to waive permit fees through April 2015 for landowners who connect to the railroad’s drainage system.
- Retaining walls to catch landslide debris before it hits the tracks.
- Slide detection fences to give early warnings of active landslides.
- Improved drainage systems.
- Erosion control.
![]() |
| Stabilizing land and reducing the steepness of a slope, as shown here near Mukilteo, can also help prevent landslides. |
Of course, there’s never a 100 percent guarantee when you’re dealing with landslides. But by addressing landslide risks and prevention head-on, we hope to reduce at least some of Mother Nature’s impact.
White House “We Can’t Wait” initiative spotlights WSDOT’s Point Defiance Bypass project
Posted by Unknown in Point Defiance Bypass, Point Defiance Bypass Environmental Assessment, rail, rail project, We Can't Wait on Friday, September 14, 2012
By guest blogger Melanie Coon
Our Point Defiance Bypass rail project was in the national spotlight when the Obama Administration included it among four US transportation projects that President Obama wants accelerated under his “We Can’t Wait” initiative. The “We Can’t Wait” announcement highlighted an executive order issued by the president last March launching a government-wide effort to make the permitting and review process for transportation projects faster and more efficient.
![]() |
| This rendering shows a rail crossing at Berkeley street near Lakewood with proposed updated safety features and signals. |
The executive order pushes the Federal Railroad Administration (FRA) who provided federal high speed rail funding for the project, to accelerate its internal review process and enable us to make those studies available to the public this fall. Shorter internal review cycles have shaved about six months off the project schedule.
We plan to publish the Point Defiance Bypass Environmental Assessment later this month and will let the public know when it’s available for review and comment. Part of that outreach includes public open houses on Oct. 10 and 11 in DuPont and Lakewood. Visit the Point Defiance Bypass webpage for times and locations. We expect a decision from FRA if we can move forward with final design by the end of this year. If all goes well, we’ll start construction in 2015 and we’ll be using the bypass by 2017.
Let us know what you think of the new Amtrak Cascades advertising campaign
Posted by Unknown in advertisement, Amtrak Cascades, rail on Thursday, October 21, 2010
We’ve launched a new advertising campaign for Amtrak Cascades this fall. The “Verbs” campaign is designed to educate people about the benefits of train travel and highlights the wide variety of things people are able to do on a train, but are difficult or impossible to do with other forms of transportation. Each element
![]() |
| Example of an ad you may see as part of this campaign, "Tweet to Vancouver B.C." |
The ads are out in the Seattle, Portland, and Vancouver, B.C. metro areas and you can see them locally here in Seattle on Sounder trains, Sound Transit Link Light Rail, outdoor billboards (downtown Seattle billboard tri-vision at Valley & Fairview), and on-line at KING 5 news, Weatherbug, and KOMO News.
![]() |
| Newspaper Ad |
Let us know what you think about the new campaign!
UPDATE: Wi-Fi is coming on-line on board Amtrak Cascades in December. We are finishing up the testing phase to make sure it is working correctly and will launch the service as soon as that is completed. So you will be able to YouTube, Skype, Tweet and more on Amtrak Cascades!





